Kherson region Projects

Ukrzaliznytsia

  • 150 kV Kherson-tiagova railway substation
    Feasibility study preparation for the interconnection of the 150 kV railway substation to the power grid and obtaining. Support with approval of this work by all the concerned entities.
    2009
 

Star UA LLC

  • 20 MW and 100 MW SPP
    Feasibility study on the interconnection of 20 MW and 100 MW solar power plants.
    2011-2012

TMM-Energo LLC

  • 100 MW WPP
    Pre-design works, preparation and adjustment of the study on wind potential and turbines location at the WPP site.
    2010
 

Novo Energy LLC

  • 30 MW SPP
    Feasibility study on the interconnection of solar power plant with the total capacity of 30 MW.
    2012