NPC Ukrenergo SE
- Mukacheve – Khust OHTL
Preparation of the feasibility study and presentations related to the project: "Completion of the double-circuit 220 kV Mukacheve – Khust OHTL construction along with Khust substation". 2007
|
|
Ukrenergo NPC SE
- 400 kV Mukacheve S/S
Correction of FS on 400 kV Mukacheve S/S rehabilitation of 110 kV OSWG including replacement of breakers into gas-insulated ones, arrangement of "two transfer busbars" systems, obtaining of positive conclusion from the State Expertise. 2016-2017
|