Zakarpattia region Projects

NPC Ukrenergo SE

  • Mukacheve – Khust OHTL
    Preparation of the feasibility study and presentations related to the project: "Completion of the double-circuit 220 kV Mukacheve – Khust OHTL construction along with Khust substation".
    2007
 

Ukrenergo NPC SE

  • 400 kV Mukacheve S/S
    Correction of FS on 400 kV Mukacheve S/S rehabilitation of 110 kV OSWG including replacement of breakers into gas-insulated ones, arrangement of "two transfer busbars" systems, obtaining of positive conclusion from the State Expertise.
    2016-2017