Kyiv region Projects

Dymerska Solar Power Plant-3 LLC

  • 9 MW SPP in the urban-type settlement Velyka Dymerka
    Performing works on the design in the contour of the site and power output scheme of the solar power plant with a capacity of 9 MW near the village Bogdanovka and urban-type settlement Velyka Dymerka, Brovary District, Kiev Region.
    2017-2018
 

Dymerska Solar Power Plant-2 LLC

  • 9 MW SPP in the urban-type settlement Velyka Dymerka
    Performing works on the design in the contour of the site and power output scheme of the solar power plant with a capacity of 9 MW near the village Bogdanovka and urban-type settlement Velyka Dymerka, Brovary District, Kiev Region.
    2017-2018

Dymerka-Solar LLC

  • 9 MW SPP in the urban-type settlement Velyka Dymerka
    Designing in the site area and performing the 9 MW solar power plant power delivery scheme near the village Bogdanovka and urban-type settlement Velyka Dymerka, Brovary District, Kiev Region.
    2017-2018
 

Dymerska Solar Power Plant-1 LLC

  • 6 MW SPP designing in the site area near the village Bogdanovka and urban-type settlement Velyka Dymerka, Brovary District, Kiev Region and performing the Feasibility Study for 50 MW solar power plant power delivery scheme. 2017-2018.
    2016-2017

Boryspil International Airport SE

  • Boryspil airport
    Correction of the detailed design for laying 10 kV cable lines to TP-1012 and DSS-39 in connection with the need to allocate two phases of construction.
    2016-2017
  • Boryspil airport
    Development of working projects for the reconstruction of relay protection equipment, replacement of a diesel generator, laying of 10 kV cable lines, coordination of the performed work with the relevant organizations.
    2012-2013
 

Industrial Park Belaya Tserkov 1 LLC

  • Development of a feasibility study for an external power supply scheme for the Belotserkovsky industrial park with a capacity of 60 MW and development of a project ("D" and "W" stages) for the construction of 110/10 kV substation and 110 kV power lines.
    2016-2017

Kyivenergo PJSC

  • CHPP-5 in Kiev
    Development of a detailed design for 110 kV "CHPP-5 - DTETS" transit reconstruction.
    2011-...
  • 110/10 kV "Universitetskaya" s/s
    Development of the project ("D" and "W" stages) for construction of 110/10 kV "Universitetskaya" s/s with two 110 kV cable lines.
    2011-2012
  • 110/10 kV "Vatutinsky" s/s
    Development of a detailed design for construction of 110/10 kV "Vatutinsky" s/s with 110 kV "Desnyansky – Vatutinskaya" cable line.
    2011-2012
 

Kievoblenergo PJSC

  • 10 / 0.4 kV distribution substation in Yagotin
    Development of detailed design for 10 kV electrical networks with construction of 10 / 0.4 kV distribution substation.
    2009-2010
  • 110/35/10 kV "Knyazhichi" s/s
    Development of the detailed design "Reconstruction of the phase-differential protection at the 110/35/10 kV "Knyazhichi" substation.
    2010
  • 110/35/10 kV "Boryspil" s/s
    Development of the detailed design "Reconstruction of the 110/35/10 kV "Boryspil" s/s, Performing capacitive current compensation for the 10 kV II busbar system.
    2010

Biogasenergo LLC

  • 18 MW TPP in the village Ivankov
    ГК Metropoliya GC has completed a full range of turnkey construction works for a thermal power plant with a capacity of 18 MW, operating on biomass in Ivankov, Kiev region, as well design work, selection, ordering and supply of equipment and materials, construction and installation works, commissioning, putting the facility in operation and obtaining all necessary approvals.
    2013-2015
 

Concord-Trade LLC

  • Shopping mall in Kiev
    Designing the external power supply scheme for the shopping mall.
    2011

Euro Finance LTD LLC

  • Electric steel rolling complex in Bila Tserkva
    Comprehensive project support for the construction of an external power supply scheme for the complex with a connected electric capacity of 195.5 MW.
    2006-2009
 

Naftogaz of Ukraine NJSC Ukrtransgaz JSC

  • Compressor station "Yagotin"
    Implementation of the feasibility study "External power supply of the Yagotin compressor station on the gas pipelines ShKD, ShPK, EBC, EKK", coordination of the completed design work with the relevant organizations.
    2011

Ukrzhitlo-Budinvest LLC

  • Multi-storey residential buildings in Sofievskaya Borshagovka
    Project management, construction of an external power supply scheme for the building and its connection to an electrical grid.
    2009-2011
 

Nest-Hanner JSC

  • Multifunctional public complex in Kiev
    Completion of a full range of works on construction of an external power supply scheme with a capacity of 12 MW and connection of the complex to the electric networks of Kyivenergo OJSC.
    2011

Prominvestgroup-1 LLC

  • Hotel complex with underground parking in Kiev
    Completion of a full range of works on construction of an external power supply scheme and connection of the complex to power grids with an installed capacity of 3.1 MW.
    2010
 

ООО "ЛНК"

  • Установка для производства электрической энергии с утилизацией свалочного газа, выделяемого на свалочном полигоне № 5 в с. Подгорцы
    Выполнение полного комплекса работ по сооружению установки для производства электрической энергии с утилизацией свалочного газа. Генерационные мощность установки составляет 4425 кВт.
    2010-2011

НСК "Олимпийский"

  • ТЭЦ-5 в г. Киев
    Выполнение проектных работ по реконструкции открытой распределительной установки 110/35 кВ ТЭЦ-5 Киевэнерго, получение положительного заключения ГП "Укрдержбудеспертиза".
    2011
 

ООО "УК" Открытое пространство"

  • Коттеджный городок в с. Рославичи
    Выполнение ТЭО схемы внешнего электроснабжения города, разработка проекта строительства ПС 110/35/10 кВ "Простор" с линиями 110, 35, 10кВ.
    2011

ООО "ТМО" Лико-Холдинг"

  • ЖК в г. Киев
    Выполнение технико-экономического обоснования схемы внешнего электроснабжения жилого комплексу.
    2011
 

ООО "Славутич Карлсберг Групп"

  • Пивоварня в г. Киев
    Предоставление экономически обоснованной предложения по снижению расходов пивоварни на электроэнергию.
    2009

ООО "Мрия-Инвест"

  • ТРК в г. Киев
    Комплексное сопровождение проекта в части создания и сооружения схемы внешнего электроснабжения торгово-развлекательного комплекса.
    2008
 

ООО ВК "Подряд"

  • Многоэтажная жилая застройка в с. Гатное
    Реализация комплексного сопровождения проекта в части строительства схемы внешнего электроснабжения застройки.
    2007-2008