Dymerska Solar Power Plant-3 LLC
- 9 MW SPP in the urban-type settlement Velyka Dymerka
Performing works on the design in the contour of the site and power output scheme of the solar power plant with a capacity of 9 MW near the village Bogdanovka and urban-type settlement Velyka Dymerka, Brovary District, Kiev Region. 2017-2018
|
|
Dymerska Solar Power Plant-2 LLC
- 9 MW SPP in the urban-type settlement Velyka Dymerka
Performing works on the design in the contour of the site and power output scheme of the solar power plant with a capacity of 9 MW near the village Bogdanovka and urban-type settlement Velyka Dymerka, Brovary District, Kiev Region. 2017-2018
|
Dymerka-Solar LLC
- 9 MW SPP in the urban-type settlement Velyka Dymerka
Designing in the site area and performing the 9 MW solar power plant power delivery scheme near the village Bogdanovka and urban-type settlement Velyka Dymerka, Brovary District, Kiev Region. 2017-2018
|
|
Dymerska Solar Power Plant-1 LLC
- 6 MW SPP designing in the site area near the village Bogdanovka and urban-type settlement Velyka Dymerka, Brovary District, Kiev Region and performing the Feasibility Study for 50 MW solar power plant power delivery scheme. 2017-2018.
2016-2017
|
Boryspil International Airport SE
- Boryspil airport
Correction of the detailed design for laying 10 kV cable lines to TP-1012 and DSS-39 in connection with the need to allocate two phases of construction. 2016-2017
- Boryspil airport
Development of working projects for the reconstruction of relay protection equipment, replacement of a diesel generator, laying of 10 kV cable lines, coordination of the performed work with the relevant organizations. 2012-2013
|
|
Industrial Park Belaya Tserkov 1 LLC
- Development of a feasibility study for an external power supply scheme for the Belotserkovsky industrial park with a capacity of 60 MW and development of a project ("D" and "W" stages) for the construction of 110/10 kV substation and 110 kV power lines.
2016-2017
|
Kyivenergo PJSC
- CHPP-5 in Kiev
Development of a detailed design for 110 kV "CHPP-5 - DTETS" transit reconstruction. 2011-...
- 110/10 kV "Universitetskaya" s/s
Development of the project ("D" and "W" stages) for construction of 110/10 kV "Universitetskaya" s/s with two 110 kV cable lines. 2011-2012
- 110/10 kV "Vatutinsky" s/s
Development of a detailed design for construction of 110/10 kV "Vatutinsky" s/s with 110 kV "Desnyansky – Vatutinskaya" cable line. 2011-2012
|
|
Kievoblenergo PJSC
- 10 / 0.4 kV distribution substation in Yagotin
Development of detailed design for 10 kV electrical networks with construction of 10 / 0.4 kV distribution substation. 2009-2010
- 110/35/10 kV "Knyazhichi" s/s
Development of the detailed design "Reconstruction of the phase-differential protection at the 110/35/10 kV "Knyazhichi" substation. 2010
- 110/35/10 kV "Boryspil" s/s
Development of the detailed design "Reconstruction of the 110/35/10 kV "Boryspil" s/s, Performing capacitive current compensation for the 10 kV II busbar system. 2010
|
Biogasenergo LLC
- 18 MW TPP in the village Ivankov
ГК Metropoliya GC has completed a full range of turnkey construction works for a thermal power plant with a capacity of 18 MW, operating on biomass in Ivankov, Kiev region, as well design work, selection, ordering and supply of equipment and materials, construction and installation works, commissioning, putting the facility in operation and obtaining all necessary approvals. 2013-2015
|
|
Concord-Trade LLC
- Shopping mall in Kiev
Designing the external power supply scheme for the shopping mall. 2011
|
Euro Finance LTD LLC
- Electric steel rolling complex in Bila Tserkva
Comprehensive project support for the construction of an external power supply scheme for the complex with a connected electric capacity of 195.5 MW. 2006-2009
|
|
Naftogaz of Ukraine NJSC Ukrtransgaz JSC
- Compressor station "Yagotin"
Implementation of the feasibility study "External power supply of the Yagotin compressor station on the gas pipelines ShKD, ShPK, EBC, EKK", coordination of the completed design work with the relevant organizations. 2011
|
Ukrzhitlo-Budinvest LLC
- Multi-storey residential buildings in Sofievskaya Borshagovka
Project management, construction of an external power supply scheme for the building and its connection to an electrical grid. 2009-2011
|
|
Nest-Hanner JSC
- Multifunctional public complex in Kiev
Completion of a full range of works on construction of an external power supply scheme with a capacity of 12 MW and connection of the complex to the electric networks of Kyivenergo OJSC. 2011
|
Prominvestgroup-1 LLC
- Hotel complex with underground parking in Kiev
Completion of a full range of works on construction of an external power supply scheme and connection of the complex to power grids with an installed capacity of 3.1 MW. 2010
|
|
ООО "ЛНК"
- Установка для производства электрической энергии с утилизацией свалочного газа, выделяемого на свалочном полигоне № 5 в с. Подгорцы
Выполнение полного комплекса работ по сооружению установки для производства электрической энергии с утилизацией свалочного газа. Генерационные мощность установки составляет 4425 кВт. 2010-2011
|
НСК "Олимпийский"
- ТЭЦ-5 в г. Киев
Выполнение проектных работ по реконструкции открытой распределительной установки 110/35 кВ ТЭЦ-5 Киевэнерго, получение положительного заключения ГП "Укрдержбудеспертиза". 2011
|
|
ООО "УК" Открытое пространство"
- Коттеджный городок в с. Рославичи
Выполнение ТЭО схемы внешнего электроснабжения города, разработка проекта строительства ПС 110/35/10 кВ "Простор" с линиями 110, 35, 10кВ. 2011
|
ООО "ТМО" Лико-Холдинг"
- ЖК в г. Киев
Выполнение технико-экономического обоснования схемы внешнего электроснабжения жилого комплексу. 2011
|
|
ООО "Славутич Карлсберг Групп"
- Пивоварня в г. Киев
Предоставление экономически обоснованной предложения по снижению расходов пивоварни на электроэнергию. 2009
|
ООО "Мрия-Инвест"
- ТРК в г. Киев
Комплексное сопровождение проекта в части создания и сооружения схемы внешнего электроснабжения торгово-развлекательного комплекса. 2008
|
|
ООО ВК "Подряд"
- Многоэтажная жилая застройка в с. Гатное
Реализация комплексного сопровождения проекта в части строительства схемы внешнего электроснабжения застройки. 2007-2008
|