Ukrzaliznytsia
- 150 kV Novopoltavka railway substation
Feasibility study preparation for the interconnection of the 150 kV railway substation to the power grid and obtaining. Support with approval of this work by all the concerned entities. 2009
- 150 kV Mykolayiv-tiagova railway substation
Feasibility study preparation for the interconnection of the 150 kV railway substation to the power grid and obtaining. Support with approval of this work by all the concerned entities. 2009
|
|
Ventureal UA LLC
- 300 MW WPP
Pre-design works on power generation scheme for WPP site with the total capacity of 300 MW. 2010-2011
|