Ukrzaliznytsia
- 110 kV Vorozhba railway substation
Feasibility study preparation for the interconnection of the 110 kV railway substation to the power grid and obtaining. Support with approval of this work by all the concerned entities. 2008-2009
- 110 kV Puteiska railway substation
Feasibility study preparation for the interconnection of the 110 kV railway substation to the power grid and obtaining. Support with approval of this work by all the concerned entities. 2008-2009
|
|
Global Green Energy Solar I LLC
- 15,05 MW SPP
Provision of consultancy services, equipment supply, execution of design, construction and installation, commissioning, as well as setting into operation of 5,05 MW solar power plant in Trostianets, Sumy Region within approved period. 2018-...
|
|
|
|