Poltava region Projects

Vorskla-Stal LLC

  • 2х380 MW metallurgical plant
    The comprehensive support of the project concerning the construction of the power supply scheme for the metallurgical plant of 2x380 MW capacity (2 stages).
    2006-2012
 

Komsomolsk Cogeneration Company LLC

  • 1506 MW combined-cycle electric generating plant
    The comprehensive support of the project concerning the development of the plant interconnection scheme of 1506 MW total capacity to suplly the industrial region load.
    2008-...

Bilanivka Mining and Processing Plant LLC

  • Bilanivka Mining and Processing Plant
    Feasibility study "Power supply scheme for the 585 MW Bilanivka mining and processing plant and the temporary 15 MW power supply of an open cast mine".
    2011-2012
  • 35 kV OHTL
    Development of the project for the construction of the 35 kV OHTL: development of full package of project documents, selection and procurement of the necessary equipment and materials, construction and installation works, commissioning works.
    2012
  • 35/10 kV substation
    Development of the project for the construction of the 35/10 kV substation: development of full package of project documents, selection and procurement of the necessary equipment and materials, construction and installation works, commissioning works.
    2012
 

Poltava Mining and Processing Plant OJSC

  • Poltava Mining and Processing Plant
    Feasibility study "Rehabilitation of a new power supply scheme for the Poltava mining and processing plant", 150 kV operating regime design calculation, selection of an optimal plant power supply scheme.
    2012-2013
  • 150/6 kV GPP-1 substation in Komsomolsk
    Development of the project (Project Study and Detailed Design stages) for the rehabilitation of the 150/6 kV GPP-1 substation with transformers replacement.
    2013-2014
  • 35/6 kV Severna substation in Komsomolsk
    Detailed engineering related to the construction of the 35/6 kV Severna substation with 35 kV cable lines.
    2012-2014
  • 35/6 kV Zapadna substation in Komsomolsk
    Detailed engineering related to the construction of the 35/6 kV Zapadna substation with 35 kV cable lines.
    2012-2014

Yerystivka Mining and Processing Plant LLC

  • Yerystivka Mining and Processing Plant
    Design works on relocation of 150 kV OHTL from the eastern dumps zone of the plant.
    2011-2013
  • 154/35/6 kV GPP-7 substation in Komsomolsk
    Detailed engineering related to the construction of the 154/35/6 kV GPP-7 substation with transformers installation.
    2013-2014
  • Komsomolsk – Odesa pulp line pump stations
    Elaboration of the power supply schemes for three pump stations to provide Komsomolsk – Odesa pulp line power supply.
    2013-2014