Autonomous Republic of Crimea Projects

West-Crimean WPP LLC

  • 250 MW WPP in Chornomorskyi districts
    Metropoliya Group acted as the turn-key contractor working on the development of the project (Feasibility Study, Project Study and Detailed Design stages) for 250 MW wind power plant construction, in particular the design of the wind turbines complex, the 35 kV power collecting cable line, the network of technological driveways, the operative manufacturing base, two 110/35 kV S/S, two 110 kV OHL, two 110-220 kV interconnection bays, and also provided the support with the construction permit obtaining.
    2012-2013
 

The Ministry of Fuel and Energy of Crimea

  • Power infrastructure of the Autonomous Republic of Crimea
    Definition of effective way to develop the power infrastructure of the Autonomous Republic of Crimea till 2020, scope of new construction, rehabilitation and upgrading of the transmission, distribution grids, and generating facilities to provide reliable power supply for the Crimean consumers.
    Analysis of the current surveys of Crimea’s RES potential, the feasibility of these sources development, as well as grounds for additional expanding of the Crimean power infrastructure to integrate new RES.
    2010

Nova-Eko LLC

  • 100 MW WPP in Leninskyi district
    The comprehensive support of the project concerning the development of WPP’s power generation scheme with the total capacity of 100 MW, namely elaboration and obtaining of the Technical Requirements for interconnection to the grid, support with licensing and permits, obtaining of the electricity sale license, as well as for joining the Wholesale Electricity Market.
    2007-2008
  • 200 MW WPP in Chornomorskyi district
    The comprehensive support of the project concerning the development of WPP’s power generation scheme with the total capacity of 200 MW, namely elaboration and obtaining of the Technical Requirements for interconnection to the grid, support with licensing and permits, obtaining of the electricity sale license, as well as for joining the Wholesale Electricity Market.
    2007-2008
 

Konkord Group LLC

  • 100 MW WPP in Leninskyi district
    Feasibility study preparation on power generation scheme for WPP site with the total capacity of 100 MW.
    2009-2010
  • 280 MW WPP in Sovietskyi district
    Feasibility study preparation on power generation scheme for WPP site with the total capacity of 280 MW.
    2009-2010

NPC Ukrenergo SE

  • Zakhidnokrymska – Sevastopol OHTL
    Preparation of the feasibility study and presentations related to the project: "Construction of 330 kV Zakhidnokrymska – Sevastopol OHTL".
    2007